Environment Assessment Referrals from July 2009
Referrals accepted since July 2009 and decisions about whether they need an EES.
For Referrals accepted between:
Please note: Document(s) on this page are presented in PDF format. If you do not have the Adobe Reader, you can download a copy free from the Adobe web site.
| No. | Title & Documents | Date accepted | Further info requested | Date of decision | Decision |
| 2009-18 | Corio Bay Channel Realignment Project | 2 November 2009 | |||
| 2009-17 | Dingley Arterial +2009-17 Attachment D1 - Desktop Flora and Fauna Report (3MB) +2009-17 Attachment E - Habitat Hectare and Net Gain Assessment Report (11MB) +2009-17 Attachment F2 - Geotechnical Investigation for Contaminated Material (4.5MB) +2009-17 Attachment G3 - Complex Cultural Heritage Assessment (13MB) | 5 October 2009 | |||
| 2009-16 | HRL Dual Gas Project | 2 October 2009 | |||
| 2009-14 | Cox's Bridge Upgrade +2009-14 Attachment 4 Flora and Fauna Assessment (5MB) +2009-14 Attachment 6 Assessment of Effects on Sale Common (8MB) | 11 September 2009 | 7 November 2009 | No EES | |
| 2009-13 | Latrobe Briquette Manufacturing Facility | 10 September 2009 | 13 November 2009 | No EES | |
| 2009-15 | M80 Ring Road Upgrade +Attachment F Project Concept design - Whole Route (70MB) +Attachment H Summary of Environmental issues Map (4MB) +Attachment K Preliminary Flora and Fauna Assessment (12MB) +Attachment L Summary of Ecological Issues and Net Gain Assessment (12MB) +Attachment Q Project Environment Protection Strategy (PEPS) - Steele Creek (16MB) +Attachment R Traffic Noise Monitoring (10MB) +Attachment S Noise Modelling Airport Drive to Hume Hwy (23MB) +Attachment T Noise Modelling WHwy Sunshine Ave (4MB) +Attachment V Preliminary Archaeological Assessment Terra Culture (97MB) +Attachment X WRR Upgrade Environmental Desktop Study (9MB) +Attachment Y Soil Assessment Area 6+7 (9MB) +Attachment Z Soil Assessment Area 3 (11MB) | 8 September 2009 | 13 November 2009 | No EES with conditions | |
| 2009-12 | Port of Melbourne Corporation 2009-2011 Maintenance Dredging Program | 10 July 2009 | 1 September 2009 | No EES with conditions | |
| 2009-05 | Moorabool Wind Project +2009-05 Flora and Fauna Final Report (3.9MB) | 6 July 2009 | 17 September 2009 | No EES |